Location: Tanajib, KSA

Industry: Construction & Infrastructure

Client Overview

El Seif Engineering Contracting (ESEC) was awarded a prestigious BOOT (Build, Own, Operate, Transfer) contract to support ARAMCO’s residential community expansion in Tanajib. Their role involved delivering comprehensive temporary office spaces and accommodations to efficiently support the main project team during ARAMCO’s major construction efforts.

case-study
case-study

Challenges

  • Extreme Weather Conditions: The site experienced heavy rainfall, sandstorms, and severe heat, impacting daily operations and requiring stringent safety protocols.
  • Logistical Constraints: Supply chain disruptions and limited transportation options delayed the delivery of construction materials and prefabricated modules to the remote location.
  • Complex Stakeholder Coordination: Coordinating between ARAMCO, ESEC, and subcontractors for services such as firefighting and IT infrastructure required meticulous planning and active communication to avoid delays.

Solution

To overcome these challenges, we implemented a tailored approach:

  • Weather Adaptation: Introduced flexible work schedules to capitalize on favourable weather and implemented advanced safety measures during extreme conditions.
  • Optimized Logistics: Engaged alternative transport providers and created on-site staging areas to facilitate timely deliveries despite logistical hurdles.
  • Enhanced Collaboration: Conducted regular meetings, both online and in person, alongside site visits to align all stakeholders and expedite approvals.
case-study

Result

Byrne Technical Services successfully delivered and installed 516 modular units within the agreed timeline, meeting ARAMCO’s stringent requirements. The project earned high client satisfaction, with El Seif Engineering Contracting commending the team for their exceptional quality of work, proactive communication, and strict adherence to deadlines. Furthermore, the project was completed with zero safety incidents, reflecting the effectiveness of the safety protocols implemented on-site. Through operational excellence, including effective teamwork and problem-solving, the team minimized delays and ensured the overall success of this challenging project.